The specification was quite high, with concrete pin kerbs, no dig situation by trees with porous tarmac, and electrical ducting, box and draw pits for lighting
The total length was just over 500m long with most path 2 metres wide, one section at 2.5 metres wide. The path run around the back of cricket nets, and a vehicle crossing point installed with additional sub base can be seen, with pin kerb markers below. Smooth curves with concrete edging part of our teams pride of workmanship