Prestwood Common Track

Date August 2020
Value £33k
Location Buckinghamshire

Great Missendon had a fantastic open space that needed a path!
With heavy tractors cutting hedging and grass, edging was considered to be a possible problem, from timber rotting, or small pin kerbs getting damaged from the gang mowers.

We carefully formed the paths using a geotextile membrane to separate grass from the path.
Different options on final finish and costs were offered, and we even saved the council over £3,000.00 on material removal by transporting some excavated soil to a local farmer.