Greenvale Primary School
Following temporary class rooms set on a piece of land that got removed and left it unusable, we graded and installed three sections of trim trail to suit KS 1 and 2 children.
Working with the land, accessibility, and level of different challenges the school requested we worked with Obra on the space available, surfacing required and budget.
The results were outstanding as can be seen, with toddler equipment down by the corresponding classrooms, and the more challenging trail set further back.
The area adjacent had been ‘cut and filled’ for the classrooms temporary installation, and left in a mess with uneven ground and random building materials scattered around.
We cleared all debris, imported 40 tons of topsoil and laid high quality Rolawn turf to make a nice usable play area.